OHA Drinking Water Services
OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 00611
PWS Name: PAISLEY, CITY OF
 
Who Was Contacted and Phone: Emma Villagrana (541) 943-3173
Contact Date: 10/04/2012
Contacted By: PARRY, BETSY (REGION 2)
Contact Method/Location: Office
 
Assistance Type: ENFORCEMENT
Reasons: Arsenic
SRF
 
Details: SUMMARY: Update on Quarterly Public Notice, Arsenic Treatment DETAILS: Emma said the Public Notice for the 3rd quarter was faxed to DWP-Portland at the end of Sept. She said the Citys RFP deadline is October 11 to recruit an engineer to oversee installing the arsenic treatment system. The chosen engineer will then hire a contractor for the actual installation. Timeline: the contract with the engineer will begin Nov. 5th, and last until approx. April 12, 2013 (that was Emmas best recollection without the date in front of her) for project completion. ACTION NEEDED: Relay this update to Brad Daniels, due to the ongoing enforcement action for the City to comply with the Arsenic standards by installing treatment.


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA For SDWIS: 3770