OHA Drinking Water Services
OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 00612
PWS Name: PARKDALE WATER COMPANY INC
 
Who Was Contacted and Phone: John Hirata (541) 352-5577
Contact Date: 10/19/2016
Contacted By: STROMQUIST, IAN (HOOD RIVER COUNTY)
Contact Method/Location: Office
 
Assistance Type: SURVEY/DEFICIENCY FOLLOW-UP
Reasons: N/A
N/A
 
Details: SUMMARY: WSS - Deficiency Follow-up, Regulatory Determination & Compliance Schedule DETAILS: On 10/13/16, Hood River County (HRCHD) rcvd a letter dated 10/12/16 from ‘Parkdale Water Company Inc.’ public water system (PWCI) detailing a plan to install a ‘flap-gate’ at the spring overflow weir in order to resolve the outstanding sig. def. from the 4/25/16 ws survey.On 10/19/16, the operator came into our office and stated they no longer believed that the ‘flap-gate’ will result in a water-tight seal. He stated that ‘PWCI’ has a new corrective action plan and proposed schedule.The new plan included installing a screened downward facing pipe to replace the existing overflow assembly.We also discussed the other outstanding rule violations including incorrectly sampled DBP tests and the pending MPA test.HRCHD drafted a letter dated 10/19/16 and sent it to the operator. The letter assigned ‘PWCI’ a corrective action schedule (and provided the operator an opportunity to formally propose an alternative schedule). A copy of the letter may be viewed at the HRCHD Env. Hlth office.The currently approved due dates for returning to compliance are:- Submit the results from the earlier MPA water quality testing, first sample12/20/15, immediately- Complete the alterations to the spring box by 10/27/16. Submit evidence by 11/6/16- Complete MPA water quality testing, second sample, and submit the results between 11/1/16 – 4/30/17. Submit Results to OHA within 10 days of rcving the test results- Submit proposed DBP sample locations to HRCHD-EH for formal review by 5/31/17- Conduct ‘routine’ DBP monitoring during June 2017 ACTION NEEDED: In order to return to compliance, and complete the tasks associated with the 4/25/16 ws survey, ‘PWCI’ shall complete the tasks listed in the conditionally approved action plan and compliance schedule listed above.


More information for this water system: SDWIS ID 3381
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA
Corrosion Control has moved to the Lead & Copper page.

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List

Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login