OHA Drinking Water Services
OR41
PWS ID: 00682 ---- PRINEVILLE, CITY OF

Most Recent Water System Survey
Survey Date: Oct 19, 2023
Notification Date: Dec 06, 2023 (48 days)
Regulating Agency: DWS (REGION 1)
Survey Frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
Category Deficiency Due Date Resolved Date
Well Construction Does not meet setbacks from hazardsApr 10, 2024 Oct 25, 2023


 Hide Site Visit History
Water System Site Visit History
Reason Visit Date Frequency Next Due Notification Date
(Days after survey)
Responsible
Agency
Comments and
Deficiencies
Sanitary Survey, Finished (SNSV) 10/19/2023 3 YR  * 12/06/2023 (48) REGION 1 Show details
Sanitary Survey, Finished (SNSV) 09/02/2020 3 YR  * 11/30/2020 (89) REGION 1 Show details
Sanitary Survey, Finished (SNSV) 05/03/2017 3 YR  * 06/30/2017 (58) REGION 1 Show details
Sanitary Survey, Finished (SNSV) 06/04/2014 3 YR  * 07/22/2014 (48) REGION 1 Show details
Sanitary Survey, Finished (SNSV) 03/16/2011 3 YR  * 04/27/2011 (42) DWP Hide details
  Comments:

Significant deficiencies noted in March 16, 2011 water system survey:

  • No demonstrated means of collecting raw water samples
  • Seal opening on well to prevent animals and insect entry into well column
  • Detectable disinfectant residual not maintained throughout distribution
  • Raw water monitoring is not current
  • Reservoir hatch not locked
  • Deepened well not submitted for plan review

Corrective Action Plan due by August 24, 2011

Category Deficiency Due Date Resolved Date
Finished Water Storage Hatch not locked or adequately securedNot tracked
Management & Operations Major modifications not approved (plan review)Not tracked
Other OtherNot tracked
Well Construction Sanitary seal and casing not watertightNot tracked
Well Construction No raw water sample tapNot tracked
UV Disinfection Annual raw water sampling past dueNot tracked
Deficiency dates were not tracked prior to 1/1/2014.
Sanitary Survey, Finished (SNSV) 07/25/2008 5 YR  * 08/21/2008 (27) REGION 1 No details
Sanitary Survey, Finished (SNSV) 04/23/2003 5 YR  * DWP Show details
 




More information for this water system: SDWIS ID 3780
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA
Corrosion Control has moved to the Lead & Copper page.

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List

Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login