OHA Drinking Water Services
OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 90861
PWS Name: CAMP MYRTLEWOOD
 
Who Was Contacted: Christopher Kinney
Contact Phone: 541-290-7974 (Email address hidden)
Contact Date: 03/07/2023
Contacted By: DOWNS, KENT (DWP)
Contact Method/Location: Email
 
Assistance Type: SURVEY/DEFICIENCY FOLLOW-UP
Survey: 03/17/2022
Reasons: Operations
 
Details: 03.01.23- Christopher Kinney with Civil West completed the tracer study.
Next step: Going forward, the system should use 43 min as their contact time when calculating daily CT. The contact time obtained through the tracer study (43 min) is considerably less than the theoretical contact time (197 min) the system had been using. This may impact the system's ability to meet the required CT during worst case conditions (high pH and low Temp days), during unfavorable conditions, the system could increase CT by increasing their chlorine residual to 2.6 ppm.

02.24.23-Christopher emailed me informing that the tracer study has been postponed. It appears the roads are still hazardous due to icy conditions.

02.17.23-On my way to Camp Myrtlewood Christopher contacted me to inform that Morgan had called about not being able to drain the tank today for the tracer study since he didn't realize he had a retreat this weekend. Given the circumstances, Christopher postponed the tracer study. The plan is to conduct the tracer study as soon as possible, when weather conditions are favorable.

Next step: Christopher will contact Morgan to reschedule the study. A time extension has been granted. the due date to complete the tracer study has been extended to March 10, 2023.


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA For SDWIS: 3927