OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00149 | ||
PWS Name: | BROOKINGS, CITY OF | ||
Who Was Contacted: | Dustin Nelson | ||
Contact Phone: | (Email address hidden) | ||
Contact Date: | 06/29/2024 | ||
Contacted By: | DOWNS, KENT (DWP) | ||
Contact Method/Location: | |||
Assistance Type: | SURVEY/DEFICIENCY FOLLOW-UP | ||
Survey: | 03/26/2024 | ||
Reasons: | Other Operations |
||
Details: | 2024 PWS Survey 06.29.2024-Operator emailed photo documentation verifying that the hatches for tanks 1-3, 5, and 8-11 are locked, adequately secured and watertight. photo documentation was also provided to verify that the drain and overflow lines for tanks 1 and 9 are equipped with a flap valve or screen. Time extension granted for the system to complete SOPs for the Neptune Microfloc water treatment plant operation, relocate source water turbidity monitoring and address the down well continuous treatment. New due date is November 15, 2024. 12-month MPA testing will begin in January 2025, following the completion of the survey corrective action. 05.21.2024- MS Teams meeting with Casey, and Jacobs staff (Dustin, Yvonne, Brad and Emily), to discuss corrective actions to address survey significant deficiencies. Next steps: Jacobs will submit a corrective action plan by June 29, 2024. Edit survey report to correct typo on survey report regarding the length of the contact pipe. The contact pipe is 2.8 miles long, not 2.5 miles. 05.11.2024-Water system survey report and cover letter emailed to DMCE and to PWS operator. Corrective actions for significant deficiencies noted in the survey report are due on 06.29.2024. |