OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 93512 | ||
PWS Name: | HELLGATE RIVER LODGE | ||
Who Was Contacted: | Jared Leard | ||
Contact Phone: | (Email address hidden) | ||
Contact Date: | 06/05/2024 | ||
Contacted By: | DOWNS, KENT (DWP) | ||
Contact Method/Location: | |||
Assistance Type: | MONITORING | ||
Reasons: | Other |
||
Details: | 06.04.2024-LT2 Sampling I contacted Jared via email and informed him that the system has not reported samples for August 16th and 30th in 2023. Jared emailed me back a copy of the lab reports. He was unsure why the lab had not reported these results. Next steps: The system has to complete their LT2 monitoring by collecting two samples in August 2024. Sample dates are set on August 14 and 28, 2024. No need to collect June or July samples this year, only August, but Jared should still report the May samples since they were collected. |