OHA Drinking Water Services
OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 00317
PWS Name: GATES, CITY OF
 
Who Was Contacted: GREG BENTHIN
Contact Phone: 503-897-2669 (Email address hidden)
Contact Date: 08/12/2024
Contacted By: BAIRD, GREGG (DWP)
Contact Method/Location: Email
 
Assistance Type: OTHER WATER QUALITY - Finished water microcystins detection over HAL
Reasons: Cyanotoxins
 
Details: The finished water sample for Wednesday 8/7/24 had a total microcystins detection of 0.54 ug/L which exceeds the 0.3 ug/L drinking water health advisory level (HAL) for vulnerable people. This requires a finished water confirmation sample be collected within 24 hours (sample scheduled to be collected 8/12). If the confirmation sample is also over the HAL, the water system will be required to issue and do-not-drink advisory for vulnerable people within 24 hours of receiving results. Although not required by rule, OHA suggested the water system consider notifying the public about the initial 8/7/24 finished water sample that is over the HAL. On 8/7/24, OHA instructed Gates to stay on daily finished water monitoring on days the treatment plant is running due to a disinfection treatment interruption on 8/7/24 (chlorinator injection line sprung a leak) and the chlorine residual dropping below 1 ppm. The injection line was repaired same-day and residual rose to 1.8 ppm at time of sampling, however Gates has been targeting a higher 3.1 ppm residual during this cyanotoxins event. Daily finished water samples collected after 8/7 should be shipped Monday 8/12 (along with the 8/12 raw and finished samples) and arrive at the DEQ lab Tuesday 8/13. Update 8/16/24: finished water results from samples collected Thursday 8/8, Saturday 8/10, and Monday 8/12 were all non-detect. Since the finished water results were not confirmed to exceed the HAL, no action is required. Gates will return to weekly raw & finished water monitoring on Mondays starting 8/19/24. Update 8/19/24: due to finished water microcystins detection less than the HAL for sample collected 8/14/24, Gates will return to daily finished water monitoring on days the treatment plant is running. Update 8/28/24: Gates qualifies to return to weekly finished water monitoring.


More information for this water system: SDWIS ID 3955
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA  ::  DW Source Protection

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List  ::  DW Source Protection

Main menu:
Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login