OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 94381 | ||
PWS Name: | USFS WALTON LAKE WELL 1 | ||
Who Was Contacted: | MICHAEL LEVRANT | ||
Contact Phone: | 305-798-4579 | ||
Contact Date: | 12/05/2024 | ||
Contacted By: | HAMBLIN, MAX (JEFFERSON COUNTY) | ||
Contact Method/Location: | Phone | ||
Assistance Type: | PLAN REVIEW | ||
Details: | TALKED WITH MICHAEL REGARDING THE EXPANSION AT WALTON LAKE. THEY ARE GOING TO ADD A 10,000GAL RESERVOIR (MAYBE 7500GAL), TO THE RIGHT OF THE ENTERANCE. IT WILL BE ELEVATED, SO TRYING TO FOR THE WATER TO BE GRAVITY FED DOWN TO DISTRIBUTION. THEY WILL HAVE A SOLAR SYSTEM WITH A BACK-UP GENERATOR. THEY WILL PUMP THE WATER UP TO THE RESERVOIR. THERE WILL BE 3 CONNECTIONS... HOST, AT THE SOURCE, AND A RV FILL STATION. THEY WILL START THE PROJECT IN THE SPRING OF 2025, HOPEFULLY COMPLETING IT WITH-IN ONE MONTH WITH LITTLE DISTRUPTION TO THE USERS. MICHAEL HAS TALKED WITH CARRIE AT THE STATE FOR PLAN REVIEW. |