OHA Drinking Water Services
Contact Report Details |
|||
| PWS ID: | OR41 00543 | ||
| PWS Name: | MOSIER, CITY OF | ||
| Who Was Contacted: | Levi Tickner | ||
| Contact Phone: | 541-760-9362 (Email address hidden) | ||
| Contact Date: | 09/08/2025 | ||
| Contacted By: | XIONG, PETER (WASCO COUNTY) | ||
| Contact Method/Location: | Phone | ||
| Assistance Type: | SURVEY/DEFICIENCY FOLLOW-UP | ||
| Survey: | 04/11/2025 | ||
| Reasons: | Operations |
||
| Details: | Spoke with Levi to confirm whether the significant deficiencies observed during the 04/11/2025 water system survey have been corrected or are in the process of being corrected. Levi confirmed that he is working on addressing the deficiencies and will provide photos and relevant documentation via email to demonstrate the changes made before the 09/20/2025 deadline. A follow-up email has been sent to Levi highlighting the significant deficiencies that still require correction. Additionally, we discussed the late reporting of DPB and LCR results for 2024, I encouraged Levi to submit his DPB and LCR results for 2024. Update 09/19/25: Operator emailed NCPHD to request an extension on the deadline for correcting deficiencies observed during the 04/11/25 water system survey. A follow-up email for more additional information and timeline estimation was sent to Levi on 09/30/2025. Update 10/02/25: A follow-up email was sent to the water operator requesting a corrective action plan. Update 10/13/25: Another follow-up email was sent to the water operator requesting a corrective action plan. Update 10/16/25: Called and left voicemail for the water operator requesting a call back to discuss developing a corrective action plan. Update 10/20/25: The operator informed me of his personal leave and provided the secondary contact's information. Update 10/22/25: Left voicemail for secondary contact and followed up with email requesting a corrective action plan. Update 10/27/25: Operator informed me that he will get photos of deficiency corrections to me today. Update 10/28/25: Operator sent in photo proofs of deficiency corrections (securing hatch, roof and access hatch watertight). Will send another round of photo proofs for screened well vents and coliform sampling plan. Update 11/17/25: Emailed the operator and secondary contact requesting the completed coliform sampling plan. Operator emailed back 11/19/25 stating that the coliform sampling plan will be completed. |
||