OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00324 | ||
PWS Name: | KERNVILLE-GLENEDEN-LINC BCH WD | ||
Who Was Contacted and Phone: | Mark Snyder (541) 764-2475 | ||
Contact Date: | 02/18/2008 | ||
Contacted By: | POTTS, JOHN (DWP) | ||
Contact Method/Location: | Field | ||
Assistance Type: | CIRCUIT RIDER ASSISTANCE | ||
Reasons: | N/A N/A |
||
Details: | SUMMARY: Stage 2 DBPR Assistance DETAILS: System is required to complete an IDSE Standard Monitoring Plan (SMP) for compliance with Stage 2 DBPR. The SMP is due 4/1/08. The SPM involves evaluating water quality data from several sources in the system to determine sampling sites and schedules for Stage II DBPR in 2009-10.I reviewed all the relevant data provided by the water system, and consulted with Wendy Marshall USEPA for a preliminary review for the SMP. I met with Mark on 2/14 to go over justification of the sites and discuss the draft SMP. I completed the SMP on 2/18 and sent to the system to submit to the EPA. ACTION NEEDED: None at this time unless requested by water system. |