OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 01233
PWS Name: DEER ISLAND WATERWORKS
 
Who Was Contacted: Main Office - Crow Water Systems
Contact Phone: -- (Email address hidden)
Contact Date: 06/05/2020
Contacted By: OSBORN, DANIEL (COLUMBIA COUNTY)
Contact Method/Location: Email
 
Assistance Type: MONITORING
Reasons: Other
 
Details: The phone number in our records for Deer Island Waterworks, which is overdue for pH water sampling, goes to Crow Water in Scappoose, OR. I sent Crow Water's main email account a notice informing them that Deer Island Waterworks (which presumably Crow Water manages/is affiliated with), is required to collect pH water tests every 14 days minimum at the entry point (EP-A), and every 36 months (3 years) in the distribution system (DIST-A). I attached a copy of Oregon Health Authority's Water Quality Parameter Monitoring Form - Lead & Copper Rule Corrosion Control form. I mentioned for them to forward Deer Island Waterworks' pH sample results to the State Drinking Water Services email, dwp.dmce@state.or.us
 
Associated Violations: Viol #901620616, 04/01/2020 - 04/30/2020: LCR - Corrosion Control Late/Nonreporting



For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA For SDWIS: 3587