OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00403 | ||
PWS Name: | IRRIGON, CITY OF | ||
Who Was Contacted and Phone: | Dave Wildman, P.E. (541) 963-8309 | ||
Contact Date: | 10/20/2008 | ||
Contacted By: | BURNETT, GARY (DWP) | ||
Contact Method/Location: | Office | ||
Assistance Type: | PLAN REVIEW | ||
Reasons: | Operations Operations |
||
Details: | SUMMARY: New Well 3 in operation. DETAILS: Well 3 is operating in an interim mode and pumping into the existing reservoir while the new reservoir is being constructed. The shallow Well 2 is still being used to control the booster pump station at the old reservoir but the deep Well 1 is now out of service. Another MPA is needed for the GWUDI evaluation and the project engineer (Wildman) will discuss that issue with Russ Kazmieczak. Water quality samples have also been done for chemicals including nitrate, VOC, SOC, IOC and Rad. The reservoir and other work is expected to be completed in January 2009. ACTION NEEDED: Chemical sample results to be submitted to DWP and entered in data base for source samples. |