OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00461 | ||
PWS Name: | RIVERGROVE WATER DISTRICT | ||
Who Was Contacted and Phone: | Jim Helton (503) 225-9010 | ||
Contact Date: | 10/21/2009 | ||
Contacted By: | FARRELLY, PETER (DWP) | ||
Contact Method/Location: | Office | ||
Assistance Type: | ENFORCEMENT | ||
Reasons: | Operations N/A |
||
Details: | SUMMARY: Informal Enforcement Action proposal DETAILS: Background Pete asked WS at the March 2009 survey to either split into 2 water systems, chlorinate the entire distribution, or stop chlorinating the entire distribution. { Rivergrove has maintained two distributions for ~10 years. } Proposal Jim Helton, city engineer from MSA, said no decision had been made on Oct. 2. Jim wants to know that if Rivergrove decides to chlorinate the entire distribution, can they piggyback their chlorination project on the back of an existing State Revolving Loan Fund (SRLF) project. Rivergrove would not complete the existing SRLF project until summer 2011. The project involves drilling a new third well, then re-sealing the two existing wells. DHS-DWP Response - (aka informal enforcement) Yes, Rivergrove can delay their decision on whether or not to chlorinate, if they: 1. submit 2 new coliform sampling plans by Dec. 31, 2009. If Rivergrove struggles to meet any of these deadlines, notify this department more than one (1) month in advance. ACTION NEEDED: WS response, asap. |