OHA Drinking Water Services
Contact Report Details |
|||
| PWS ID: | OR41 00466 | ||
| PWS Name: | LANGLOIS WATER DISTRICT | ||
| Who Was Contacted and Phone: | Dave Terrusa/Jessie Bradley (541) 348-2143 | ||
| Contact Date: | 05/05/2010 | ||
| Contacted By: | POTTS, JOHN (DWP) | ||
| Contact Method/Location: | Field | ||
| Assistance Type: | CIRCUIT RIDER ASSISTANCE | ||
| Reasons: | N/A N/A |
||
| Details: | SUMMARY: Stage 2 DBPR IDSE Report Assistance DETAILS: System requested HBH for preparation of the IDSE Report for Standard Monitoring for Stage 2 DBPR. The report is due 6/30/10. The system did not collect IDSE samples according to the SMP submitted in 2008. A revised IDSE SMP needs to be prepared. I visited Dave and Jessie and reviewed the requirements for Stage 2 DBPR and future sampling beginning in 2013. I discovered that the IDSE sampling for 2009-10 was not done. I reviewed their original SMP and explained that a new SMP would have to be completed and sampling would most likely begin in May. I corresponded with Gregg Baird, DWP, about the situation and he recommended a sampling schedule that I emailed to the system as sampling was to begin in May 2010. ACTION NEEDED: Evaluate data and complete report and send to system and DWP. | ||