OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 05592 | ||
PWS Name: | BOB BELLONI RANCH | ||
Who Was Contacted and Phone: | Dale Willis | ||
Contact Date: | 04/26/2011 | ||
Contacted By: | MACPHERSON, JAMES (REGION 2) | ||
Contact Method/Location: | Field | ||
Assistance Type: | PLAN REVIEW | ||
Reasons: | SWTR None |
||
Details: | SUMMARY: Confirm coagulation installed, flow meter moved, approved bag filters DETAILS: Coagulation is installed and fed before the built-in storage tanks inside the treatment building. This provides maximum contact time before the iron removal device. Two flow meters are now in use, one for flow through treatment and one after storage. The new bag filters are approved Strainrites. ACTION NEEDED: none |