OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00438 | ||
PWS Name: | ROUND LAKE WATER UTILITIES | ||
Who Was Contacted and Phone: | Alan Harris (541) 891-7047 | ||
Contact Date: | 09/06/2013 | ||
Contacted By: | PARRY, BETSY (REGION 2) | ||
Contact Method/Location: | Office | ||
Assistance Type: | OTHER REGULATORY - REGULATORY ASSISTANCE | ||
Reasons: | Disinfection Byproducts None |
||
Details: | SUMMARY: Completed IDSE Standard Monitoring Plan for Stage 2 DBP Rule DETAILS: Round Lake had missed the deadline for a Small System waiver in the DBP Rule, so the only option was to quickly create an IDSE Standard Monitoring Plan (preferably before their Stage 2 start date of 10/1/2013). With Alans help over the last couple of days, I completed the SMP template, and added the required site monitoring locations to a system diagram from the last survey. These materials were submitted to DWSs Gregg Baird, who approved the plan. An approval letter was written today. The SMP dictates that two dual sample sets for DBPs will be taken in Sept 2013 (one at subdivision, one at reservoir booster station) . ACTION NEEDED: Await results of the dual sample sets to be taken later this month, and use these results to complete the IDSE Report, dictating where Round Lake will conduct their Stage 2 DBP monitoring (starting next summer). |