OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00482 | ||
PWS Name: | HILAND WC - BEAR CREEK | ||
Who Was Contacted and Phone: | Silas Olsen (855) 554-8333 | ||
Contact Date: | 03/24/2014 | ||
Contacted By: | BURNS, LAURA C (DWP) | ||
Contact Method/Location: | Office | ||
Assistance Type: | OTHER REGULATORY - REGULATORY ASSISTANCE | ||
Reasons: | SWTR SWTR |
||
Details: | SUMMARY: Update on Membrane plant construction DETAILS: I spoke with Silas and they are progressing well on the construction of the membrane plant for Bear Creek. They plan still plan on completing construction in April, 2014. Silas has requested a modification of the Plan Review to allow replacement of the fill line between the pump house and the reservoir. The longer and bigger line (from a 2 inch line to a 24 inch line) will help them meet CT requirements. ACTION NEEDED: Bear Creek (Hiland Water) needs to submit plans for their pipeline proposal. |