OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 05592 | ||
PWS Name: | BOB BELLONI RANCH | ||
Who Was Contacted and Phone: | Jim Pinson | ||
Contact Date: | 10/03/2014 | ||
Contacted By: | MACPHERSON, JAMES (REGION 2) | ||
Contact Method/Location: | Office | ||
Assistance Type: | VIOLATION RESPONSE | ||
Reasons: | Lead or Copper Operations |
||
Details: | SUMMARY: Plumbing replacement plan DETAILS: Discussed how the plumbing replacement would proceed. Existing copper pipe will be replaced with polymeric pipe (PVC or PEX). Hot water lines will also be replaced. Short sections (e.g., 1 ft) of copper may be left in place if removal impractical (this is because surface area of copper pipe will be greatly reduced by this replacement program). Work may proceed, after which special samples should be collected. Once the results are received from the lab, write a report to DWS describing the work, dates of work and sampling, results of sampling. ACTION NEEDED: none |