OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00438 | ||
PWS Name: | ROUND LAKE WATER UTILITIES | ||
Who Was Contacted and Phone: | Alan Harris (541) 891-7047 | ||
Contact Date: | 02/04/2015 | ||
Contacted By: | PARRY, BETSY (REGION 2) | ||
Contact Method/Location: | Office | ||
Assistance Type: | OTHER REGULATORY - REGULATORY ASSISTANCE | ||
Reasons: | Disinfection Byproducts None |
||
Details: | SUMMARY: Ready to change to Stage 2 DBP schedule DETAILS: Round Lake completed their IDSE sampling in Sept 2014, and their DBP schedule may now be updated for Stage 2 sampling. I phoned operator Alan Harris today to let him know of the change, and the DBP monitoring expectations for 2015. Future (Stage 2) requirements will be to take a dual sample set in Sept from what had also been their Stage 1 location. Per his request, I also confirmed that a reminder letter will be sent to him approximately a month ahead of time stating where and when to take this years samples. ACTION NEEDED: I submitted the schedule change request form to DMCE. I also pointed out that the original (Stage 1) location had been mislabeled in the database way back when - DBPs were always taken from the golf courses Maintenance Shop rather than at the Pro Shop. In other words, the Stage 1 samples were all taken where they should be, at the location of maximum water residence time (which is the Maintenance Shop, at the end of that distribution line). The Pro Shop is not quite at the end of that same line. The operator had apprised me of this issue in the past, and I hoped we could get that location label corrected at this time, if possible. |