OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00262 | ||
PWS Name: | DUNDEE, CITY OF | ||
Who Was Contacted and Phone: | Alan Mustain (503) 538-3922 ext. 5 | ||
Contact Date: | 03/22/2016 | ||
Contacted By: | HOFELD, EVAN (REGION 1) | ||
Contact Method/Location: | Office | ||
Assistance Type: | OTHER REGULATORY - REGULATORY ASSISTANCE | ||
Reasons: | Operations Lead or Copper |
||
Details: | SUMMARY: City plans to place Well 11 (SRC-AE) into use for testing DETAILS: Alan Mustain called to notify DWS that they plan on placing well 11 (SRC-AE) into use for component testing prior to the end of the construction warranty period. We discussed water quality parameter testing during the warranty testing and the need for two 6-month rounds of lead and copper tap samples when the well is placed into more regular use. Alan stated that they plan to place the well into use this week for warranty testing and will notify DWS when the well is taken off-line at the conclusion of the testing. Once the well is placed into more regular use, lead and copper tap sampling is expected to be completed. ACTION NEEDED: City to follow water quality parameter testing in accordance with my letter dated January 1, 2016 while well 11 (SRC-AE) is placed into use for warranty testing. City to notify DWS when well is taken off-line after warranty testing is completed. City to follow lead and copper tap sampling and water quality parameter sampling according to my letter dated January 21, 2016 once the well is placed into regular service. |