OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00784 | ||
PWS Name: | PIONEER PARK CO-OP INC | ||
Who Was Contacted and Phone: | Steve Albin (503) 970-0224 | ||
Contact Date: | 03/03/2017 | ||
Contacted By: | SOLVEDT, JIM (POLK COUNTY) | ||
Contact Method/Location: | Office | ||
Assistance Type: | OTHER REGULATORY - REGULATORY ASSISTANCE | ||
Reasons: | N/A N/A |
||
Details: | SUMMARY: Discussion Over Plan Specifics (Time Frame and Pipe Size) DETAILS: I spoke to Steve about the time frame of construction (pipe or tanks). He said that the board has decided to use pipe. I asked him to send me a letter with pipe size info. so this information can be forwarded to the State DWP for a CT calculation prior to construction. He said construction would not begin until the soil is drier, most likely April or May. I had mentioned that the pipe installation must conform to the OAR construction standards. He will meet with the board again to do measurements and to discuss the pipe size choices that HBH had recommended. ACTION NEEDED: F/U Plan letter submittal / CT calculation. |