OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00260 | ||
PWS Name: | DRAIN, CITY OF | ||
Who Was Contacted and Phone: | Carl Patenode | ||
Contact Date: | 03/29/2017 | ||
Contacted By: | TEMPLIN, REBECCA (REGION 2) | ||
Contact Method/Location: | Office | ||
Assistance Type: | ENFORCEMENT | ||
Reasons: | Lead or Copper N/A |
||
Details: | SUMMARY: Reduce lead and copper schedule DETAILS: The City of Drain had two 6-month rounds that were below the action level for lead. Drain can now reduce testing for lead and copper to annually during the summer months (June 1st to September 30th) and measure water quality parameters (WQP) at the entry point and in the distribution system. Compliance schedule for installing corrosion control has been closed. ACTION NEEDED: Do annual lead and copper testing during June 1st and Sept 30th and WQP at entry point and in distribution. |