OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 05548 | ||
PWS Name: | RAINTREE ESTATES | ||
Who Was Contacted and Phone: | Debbie Cassisdy | ||
Contact Date: | 04/27/2017 | ||
Contacted By: | KRUGER, SCOTT (BENTON COUNTY) | ||
Contact Method/Location: | Office | ||
Assistance Type: | SURVEY/DEFICIENCY FOLLOW-UP | ||
Reasons: | N/A N/A |
||
Details: | SUMMARY: Significant Deficiency Follow-up and Compliance DETAILS: The system is not current with its lead and copper testing due a system pressure failure in September 2016. The third party testing contractor waited until the last days of September and then a loss of pressure. The repairs could not be made in a timely manner and the test could not be submitted. The system asked for a compliance schedule to meet lead and copper testing parameters of June 1 to September 30.I have granted the extension and reminded them to test early in the compliance period to avoid this from occuring in the future. ACTION NEEDED: Wait for lead and copper testing to be submitted after June 1, 2017. |