OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00213 | ||
PWS Name: | COQUILLE, CITY OF | ||
Who Was Contacted and Phone: | John Higgins, Tim Ellis, Ray Doan (541) 396-2115 ext. 209 | ||
Contact Date: | 02/28/2008 | ||
Contacted By: | POTTS, JOHN (DWP) | ||
Contact Method/Location: | Field | ||
Assistance Type: | CIRCUIT RIDER ASSISTANCE | ||
Reasons: | N/A N/A |
||
Details: | SUMMARY: Stage 2 DBPR Assistance DETAILS: System requested circuit rider assistance for preparation of the Standard Monitoring Plan (SMP) for compliance with Stage 2 DBPR. The SMP is due 4/1/08. The SPM involves evaluating water quality data from several sources in the system to determine sampling sites and schedules for Stage II DBPR in 2009-10.I met with the Staff to provide an overview of the rule and what is required and when. I conducted an initial review of water quality data (chlorine residuals, CT reports, DBP results, unfiltered data) along with the distribution map and where Stage I samples had been collected. I conducted a preliminary review of water quality data in order to establish sample sites and prepared a draft SMP pending further review ACTION NEEDED: Complete the SMP. |