OHA Drinking Water Services
OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 00403
PWS Name: IRRIGON, CITY OF
 
Who Was Contacted and Phone: Keith White
Contact Date: 07/20/2009
Contacted By: BURNETT, GARY (DWP)
Contact Method/Location: Field
 
Assistance Type: PLAN REVIEW
Reasons: Operations
Operations
 
Details: SUMMARY: Completed plan review construction inspection, Plan Review 22-2007 DETAILS: G. Burnett and A. Baker completed the plan review construction inspection in conjunction with the routine water system survey. The project was substantially completed about May 1, 2009, and the new 1.5 MG reservoir has been in operation along with the new wells. The construction of the 12 inch water main in Highway 730 has been postponed for a time pending additional engineering review of the location. R. Kazmierczak is reviewing water quality data including MPAs to determine if the new wells are GWUDI or not. ACTION NEEDED: Final approval of Plan Review 22-2007 can be granted when GWUDI determination is completed.


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA For SDWIS: 3740