OHA Drinking Water Services
OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 00315
PWS Name: LAURELWOOD WATER USERS
 
Who Was Contacted and Phone: Bill Billingsley (503) 985-7450
Contact Date: 11/19/2010
Contacted By: HOFELD, EVAN (REGION 1)
Contact Method/Location: Office
 
Assistance Type: PLAN REVIEW
Reasons: Chlorine
Coliform
 
Details: SUMMARY: Discussion on Plan Review 185-2010 for chlorination DETAILS: Bill Billingsley called to discuss plan review requirements for their system. He said that Joseph Federico said the system needed to initiate plan review for the installation of disinfection in order to address coliform problems in the system. I asked if the spring construction had been evaluated and he said that it hadnt been discussed. I explained that their past practice of batch chlorination can mask potential source contamination, which is why we do not allow it and that typically the source construction is addressed first before chlorination is installed. They are considering installing an erosion chlorinator type Biodynamic XT2000S tablet feeder. I told him to draw up a brief schematic and fax me what info they had on the chorination system to 971-673-0694 and that I would speak with Gregg Baird and Joseph Federico regarding the next steps. I told Bill that I would fax (503-985-7450) him more info on the plan review process once his information is reviewed and discussed with Joseph and Gregg. ACTION NEEDED: System to submit what information is available on the proposed treatment and Evan Hofeld to discuss plan review requirements with Gregg Baird (DWP) and Joseph Federico (WA Co). This project is assigned plan review number 185-2010


More information for this water system: SDWIS ID 3302
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA
Corrosion Control has moved to the Lead & Copper page.

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List

Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login