OHA Drinking Water Services
PWS ID: 00230 ---- WESLINN WATER COMPANY

Corrosion Control (LCR)

Minimums Required For This System
Facility pH Alkalinity Phosphate Silicate Required Frequency Last Modified
 
-- indicates that the system is not required to test for that parameter
* Entry point readings can be taken daily but are required at least every 14 days.
DIST-A 7.0 -- -- -- 6 Months May 04, 2021
EP-A 7.0 -- -- -- * May 04, 2021


Test Results
Period Facility Excursions
This Period
Total Excursions
For 6-Month
Monitoring Period
Date Received
 
Feb 2023 (pdf) EP-A 0 0 Feb 28, 2023
Jan 2023 (pdf) EP-A 0 Jan 31, 2023
Dec 2022 (pdf) EP-A 0 0 Jan 04, 2023
Nov 2022 (pdf) EP-A 0 Feb 27, 2023
Oct 2022 (pdf) EP-A 0 Nov 02, 2022
Sep 2022 (pdf) EP-A 0 Sep 30, 2022
Aug 2022 (pdf) EP-A 0 Sep 09, 2022
Jul 2022 (pdf) EP-A 0 Aug 03, 2022
Jun 2022 (pdf) EP-A 0 0 Jul 01, 2022
May 2022 (pdf) EP-A 0 Jun 03, 2022
Apr 2022 (pdf) EP-A 0 May 09, 2022
Mar 2022 (pdf) EP-A 0 Apr 04, 2022
Feb 2022 (pdf) EP-A 0 Mar 08, 2022
Jan 2022 (pdf) EP-A 0 Feb 07, 2022
Dec 2021 (pdf) EP-A 0 0 Dec 31, 2021
Nov 2021 (pdf) EP-A 0 Nov 30, 2021
Oct 2021 (pdf) EP-A 0 Nov 01, 2021
Sep 2021 (pdf) EP-A 0 Oct 06, 2021
Aug 2021 (pdf) EP-A 0 Sep 06, 2021
Jul 2021 (pdf) EP-A 0 Aug 09, 2021
Jun 2021 (pdf) EP-A 0 0 Jul 16, 2021
May 2021 (pdf) EP-A 0 Jun 02, 2021
Apr 2021 (pdf) EP-A 0 May 03, 2021
Mar 2021 (pdf) EP-A 0 Apr 02, 2021
Feb 2021 (pdf) EP-A 0 Apr 02, 2021
Jan 2021 (pdf) EP-A 0 Feb 02, 2021
Dec 2020 EP-A 0 0 Dec 31, 2020
Nov 2020 EP-A 0 Nov 30, 2020
Oct 2020 EP-A 0 Oct 31, 2020
Sep 2020 EP-A 0 Sep 30, 2020
Aug 2020 EP-A 0 Sep 11, 2020
Jul 2020 EP-A 0 Aug 06, 2020
Jun 2020 EP-A 0 0 Jul 06, 2020
May 2020 EP-A 0 Jun 03, 2020



For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA For SDWIS: 3278