Chemical Sampling Schedule Status         OR4100223 -- WHISPERING PINES MOBILE LODGE
Sample
Point
ID
Analyte
Code
Analyte
  Sampling
Interval
Monitoring
Period
Start
Monitoring
Period
Due Date
Days
Until
Due
Samples
Required
Samples
Received
Last
Sample
Date
EP-A  EP FOR WELL 4010 COMBINED RADIUM (-226 & -228) 6 Years01/01/2020 - 12/31/2025 821 1 0 12/11/2019


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA

Need help? Email Drinking Water Services for assistance.