Most Recent Water System Survey | |||||||||||||||||
Survey Date: | Oct 06, 2021 | ||||||||||||||||
Notification Date: | Dec 29, 2021 (84 days) | ||||||||||||||||
Regulating Agency: | DWS (REGION 1) | ||||||||||||||||
Survey Frequency: | Visit the Water System Surveys page to see the list of surveys due each year. | ||||||||||||||||
Deficiencies: |
|
Water System Site Visit History | ||||||
Reason | Visit Date | Frequency | Next Due | Notification Date (Days after survey) |
Responsible Agency |
Comments and Deficiencies |
---|---|---|---|---|---|---|
Sanitary Survey, Finished (SNSV) | 10/06/2021 | * | 12/29/2021 (84) | REGION 1 | Show details | |
Water Treatment Plant Site Visit (TRTP) | 10/06/2021 | 3 YR | 10/06/2024 | 12/29/2021 (84) | REGION 1 | No details |
Sanitary Survey, Finished (SNSV) | 06/12/2018 | 3 YR | * | 06/21/2018 (9) | REGION 1 | Show details |
Water Treatment Plant Site Visit (TRTP) | 06/12/2018 | 3 YR | 06/12/2021 | 06/21/2018 (9) | REGION 1 | No details |
Sanitary Survey, Finished (SNSV) | 08/26/2015 | 3 YR | * | 09/03/2015 (8) | REGION 1 | Show details |
Water Treatment Plant Site Visit (TRTP) | 08/26/2015 | 3 YR | 08/26/2018 | 09/03/2015 (8) | REGION 1 | No details |
Sanitary Survey, Finished (SNSV) | 08/09/2012 | 3 YR | * | 09/10/2012 (32) | DWP | Show details |
Sanitary Survey, Finished (SNSV) | 07/15/2009 | 3 YR | * | 07/20/2009 (5) | DWP | Show details |
Water Treatment Plant Site Visit (TRTP) | 07/15/2009 | 3 YR | 07/15/2012 | 07/20/2009 (5) | DWP | Show details |
Sanitary Survey, Finished (SNSV) | 07/12/2007 | 3 YR | * | 06/12/2008 (336) | REGION 1 | Hide details |
Comments: The deficiencies noted are as follows: Surface Treatment Deficiencies 1. Calibrate turbidimeters at least quarterly. 2. Perform Tracer Study at peak hourly demand flowrate when clearwell is at lowest level. HBH can assist with the study; see enclosed pamphlet. 3. Record residual chlorine measurements daily near end of distribution system. Management and Operations Deficiencies 4. A Water System Operations Manual must be developed and kept up to date. The operations manual should include procedures and schedules for backwashing, calibrating chemical feed pumps, calibrating turbidimeters, maintaining the reservoir and the clearwell, flushing the distribution system, etc. Please see the enclosed information for further details. { OAR 333-061-0064 (2)(c) } Operator Certification Deficiencies 5. A written protocol for operators is required such that under-certified operators make operations decisions according to the protocol established by the operator in Direct Responsible Charge { OAR 333-061-0225 (5) } This site visit has not been entered into the deficiency database. | ||||||
Sanitary Survey, Finished (SNSV) | 08/19/2003 | 3 YR | * | DWP | Show details | |