Most Recent Water System Survey | |||||||||||||
Survey Date: | Dec 11, 2023 | ||||||||||||
Notification Date: | Jan 31, 2024 (51 days) | ||||||||||||
Regulating Agency: | DWS (REGION 2) | ||||||||||||
Survey Frequency: | 3 YR - Visit the Water System Surveys page to see the list of surveys due each year. | ||||||||||||
Deficiencies: |
* Corrective Action Plan has been submitted for this deficiency. |
Water System Site Visit History | ||||||
Reason | Visit Date | Frequency | Next Due | Notification Date (Days after survey) |
Responsible Agency |
Comments and Deficiencies |
---|---|---|---|---|---|---|
Sanitary Survey, Finished (SNSV) | 12/11/2023 | 3 YR | * | 01/31/2024 (51) | REGION 2 | Show details |
Water Treatment Plant Site Visit (TRTP) | 12/11/2023 | 3 YR | 12/11/2026 | 01/31/2024 (51) | REGION 2 | No details |
Sanitary Survey, Finished (SNSV) | 09/30/2020 | 3 YR | * | 11/03/2020 (34) | REGION 2 | Show details |
Water Treatment Plant Site Visit (TRTP) | 09/30/2020 | 3 YR | 09/30/2023 | 11/03/2020 (34) | REGION 2 | No details |
Sanitary Survey, Finished (SNSV) | 05/01/2017 | 3 YR | * | 05/12/2017 (11) | REGION 1 | Show details |
Water Treatment Plant Site Visit (TRTP) | 05/01/2017 | 3 YR | 05/01/2020 | 05/12/2017 (11) | REGION 1 | No details |
Water Treatment Plant Site Visit (TRTP) | 11/12/2014 | 3 YR | 11/12/2017 | 12/10/2014 (28) | REGION 2 | No details |
Sanitary Survey, Finished (SNSV) | 02/13/2014 | 3 YR | * | 02/21/2014 (8) | REGION 2 | Show details |
Water Treatment Plant Site Visit (TRTP) | 02/13/2014 | 6 MN | 08/13/2014 | 02/21/2014 (8) | DWP | Show details |
Sanitary Survey, Finished (SNSV) | 11/17/2011 | 3 YR | * | 12/30/2011 (43) | REGION 2 | Show details |
Water Treatment Plant Site Visit (TRTP) | 11/17/2011 | 3 YR | 11/17/2014 | 12/30/2011 (43) | REGION 2 | Show details |
Water Treatment Plant Site Visit (TRTP) | 09/23/2009 | 3 YR | 09/23/2012 | 10/08/2009 (15) | REGION 2 | Show details |
Sanitary Survey, Finished (SNSV) | 12/12/2008 | 3 YR | * | 01/21/2009 (40) | REGION 2 | Hide details |
Comments: 1. Conventional WTP with 2.5 log reduction for Giardia must measure settled water turbidity daily. 2. Filter profiles must be conducted at least quarterly. 3. All chemicals added to drinking water must be NSF approved. 4. All tank drain/overflow pipes must have screening or flap valves. 5. Cross-connection records must be kept current. 6. Water systems must have written coliform sampling plan. 7. Water systems must have a written protocol for non-certified operators. 8. A current tracer study must be documented, or a new tracer study is required. This site visit has not been entered into the deficiency database. | ||||||
Water Treatment Plant Site Visit (TRTP) | 12/12/2008 | 1 YR | 12/12/2009 | 01/21/2009 (40) | REGION 2 | Show details |
Sanitary Survey, Finished (SNSV) | 05/24/2005 | 3 YR | * | DWP | Show details | |
Water Treatment Plant Site Visit (TRTP) | 05/24/2005 | 6 MN | 11/24/2005 | 09/08/2005 (107) | REGION 2 | No details |