OHA Drinking Water Services
OR41
PWS ID: 00534 ---- MOLALLA, CITY OF

Most Recent Water System Survey
Survey date: Jun 21, 2023
Notification date: Jul 11, 2023 (20 days)
Regulating agency: DWS (REGION 1)
Survey frequency: 5 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Significant deficiencies and unmet rule requirements: Outstanding Performer!
No significant deficiencies or unmet rule requirements were identified for this survey.


 Hide Site Visit History
Water System Site Visit History
Reason Visit date Frequency Next due Notification date
(Days after survey)
Responsible
agency
Comments and
significant deficiencies or unmet rule requirements
Sanitary Survey, Finished (SNSV) 06/21/2023 5 YR  * 07/11/2023 (20) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 06/21/2023 3 YR 06/21/2026 07/11/2023 (20) REGION 1 No details
Sanitary Survey, Finished (SNSV) 10/20/2020 3 YR  * 11/12/2020 (23) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 10/20/2020 3 YR 10/20/2023 11/12/2020 (23) REGION 1 No details
Sanitary Survey, Finished (SNSV) 09/12/2017 3 YR  * 09/20/2017 (8) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 09/12/2017 3 YR 09/12/2020 09/20/2017 (8) REGION 1 No details
Sanitary Survey, Finished (SNSV) 10/23/2014 3 YR  * 01/30/2015 (99) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 10/23/2014 6 MN 04/23/2015 01/30/2015 (99) REGION 1 No details
Sanitary Survey, Finished (SNSV) 06/08/2011 3 YR  * 09/27/2011 (111) DWP Show details
Water Treatment Plant Site Visit (TRTP) 06/08/2011 3 YR 06/08/2014 DWP Show details
Sanitary Survey, Finished (SNSV) 11/21/2008 3 YR  * 12/23/2008 (32) DWP Show details
Water Treatment Plant Site Visit (TRTP) 11/21/2008 1 YR 11/21/2009 12/19/2008 (28) DWP Show details
Sanitary Survey, Finished (SNSV) 12/01/2005 3 YR  * 02/16/2006 (77) REGION 1 Hide details
  Comments:
The deficiencies noted are as follows:

Treatment Deficiencies
1. Make turbidity profiles quarterly.
2. Measure settled water turbidity at least daily from the Trident Microfloc upflow adsorption clarifiers.
3. Calibrate feed pumps at least annually.
4. Calibrate turbidimeters at least quarterly.

Management & Operations Deficiencies
5. Develop written standard operating procedures (SOP) for all processes at the plant.
6. Water System Operations Manual required.
7. Emergency Response Plan required.
This site visit has not been entered into the deficiency database.

Water Treatment Plant Site Visit (TRTP) 12/01/2005 1 YR 12/01/2006 02/16/2006 (77) DWP Show details
Sanitary Survey, Finished (SNSV) 10/16/2002 3 YR  * DWP Show details