Most Recent Water System Survey | ||||
Survey Date: | Jul 21, 2022 | |||
Notification Date: | Jul 25, 2022 (4 days) | |||
Regulating Agency: | LANE COUNTY | |||
Survey Frequency: | 5 YR - Visit the Water System Surveys page to see the list of surveys due each year. | |||
Deficiencies: | No deficiencies were identified. |
Water System Site Visit History | ||||||
Reason | Visit Date | Frequency | Next Due | Notification Date (Days after survey) |
Responsible Agency |
Comments and Deficiencies |
---|---|---|---|---|---|---|
Sanitary Survey, Finished (SNSV) | 07/21/2022 | 5 YR | * | 07/25/2022 (4) | LANE COUNTY | Show details |
Sanitary Survey, Finished (SNSV) | 02/04/2009 | 5 YR | * | 02/20/2009 (16) | REGION 2 | Hide details |
Comments: 1. Well head seal needs to be made watertight (pump cable leaves open annular space). 2. Coliform sampling plan was prepared with Brenda during the visit. 3. Emergency response plan to be prepared. 4. O&M Manual to be prepared. 5. Plan Review should be initiated for existing new well. (Recommended abandoning old well and locating neighbor's septic drainfield.) This site visit has not been entered into the deficiency database. | ||||||