Most Recent Water System Survey | |||||||||||||||||||||||||||||
Survey Date: | Jul 12, 2022 | ||||||||||||||||||||||||||||
Notification Date: | Aug 05, 2022 (24 days) | ||||||||||||||||||||||||||||
Regulating Agency: | DWS (REGION 2) | ||||||||||||||||||||||||||||
Survey Frequency: | 5 YR - Visit the Water System Surveys page to see the list of surveys due each year. | ||||||||||||||||||||||||||||
Deficiencies: |
* Corrective Action Plan has been submitted for this deficiency. |
Water System Site Visit History | ||||||||||||||||||||||||||||||||||
Reason | Visit Date | Frequency | Next Due | Notification Date (Days after survey) |
Responsible Agency |
Comments and Deficiencies |
||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sanitary Survey, Finished (SNSV) | 07/12/2022 | 5 YR | * | 08/05/2022 (24) | REGION 2 | Show details | ||||||||||||||||||||||||||||
Water Treatment Plant Site Visit (TRTP) | 07/12/2022 | 6 MN | 01/12/2023 | 08/05/2022 (24) | REGION 2 | No details | ||||||||||||||||||||||||||||
Sanitary Survey, Finished (SNSV) | 04/28/2010 | 3 YR | * | 08/13/2010 (107) | JOSEPHINE COUNTY | Hide details | ||||||||||||||||||||||||||||
Comments: Treatment: Surface Water Treatment: -Turbidity Standards not met. Must be less than 0.3 NTU in 95% of measurements. -No alarm or plant shut off for high turbidity -Turbidity profile not conducted on individual filters at least quarterly. Disinfection: -Minimum CT requirement not met all times. Achieve at least 99.9 percent inactivation and/or removal of giardia lamblia and 99.99 percent of viruses. -No documentation of NSF approval on Culligan F-86 polymer -Chlorine residual not measured and recorded in distribution system at least twice weekly. Recommendations: 1. Raw water turbidity should be collected at least daily. 2. Jar testing or equivalent should be used regularly. 3. Chemical dosages, strengths, and feed rates should be known and recorded during plant operation.
Deficiency dates were not tracked prior to 1/1/2014. | ||||||||||||||||||||||||||||||||||
Sanitary Survey, Finished (SNSV) | 07/12/2005 | 5 YR | * | JOSEPHINE COUNTY | Show details | |||||||||||||||||||||||||||||