OHA Drinking Water Services
OR41
PWS ID: 05384 ---- SHANIKO WATER SYSTEM

Most Recent Water System Survey
Survey date: Sep 23, 2022
Notification date: Oct 14, 2022 (21 days)
Regulating agency: WASCO COUNTY
Survey frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Significant deficiencies and unmet rule requirements:
Category Significant deficiency or unmet rule requirement Due date Resolved date
Monitoring & Reporting No coliform sampling planApr 12, 2023 Mar 31, 2023
Cross Connection Annual summary report not issued (CWS)Jun 01, 2023 * May 11, 2023
Cross Connection Testing records not current (CWS, NTNC, TNC)Jun 01, 2023 * May 11, 2023
Finished Water Storage Roof and access hatch not watertight or adequately securedJun 01, 2023 * May 19, 2023
Operator Certification No DRC at required certification level Jun 01, 2023 * May 11, 2023
Management & Operations Annual CCR not distributed (CWS)Jul 01, 2023 * Mar 31, 2023
Management & Operations No operations and maintenance manualDec 31, 2023 * Dec 29, 2023
* A corrective action plan has been submitted for this significant deficiency or unmet rule requirement.


 Hide Site Visit History
Water System Site Visit History
Reason Visit date Frequency Next due Notification date
(Days after survey)
Responsible
agency
Comments and
significant deficiencies or unmet rule requirements
Sanitary Survey, Finished (SNSV) 09/23/2022 3 YR  * 10/14/2022 (21) WASCO COUNTY Show details
Sanitary Survey, Finished (SNSV) 10/07/2010 5 YR  * 11/22/2010 (46) WASCO COUNTY Hide details
  Comments:

The deficiencies noted are as follows:

Source Deficiencies
1. No watertight access hatch/entry.

Finished Water Storage Deficiencies
1. Hatch not locked or adequately secured.

Management & Operations Deficiencies
1. No Operation and Maintenance Manual.
2. No Emergency Response Plan.
3. Annual CCR not submitted.

The recommendations and comments noted are as follows:

1. The access hatch to spring 5 needs to be lockable.
2. Repair the east side overflow pipe that is cracked and locate the end of the pipe and clear the area around where it daylights. Verify that it is
screened properly.
3. A summary of your monitoring requirements can be found on page 12. Please maintain a copy of this page and refer to it for future monitoring scheduling.
4. Recommending that your water system be changed from a Community Water System to a State-Regulated Water System due to your current
population statistics. We should review the population numbers of your community in one year to assure the community does not once again grow
into a "community water system".
This site visit has not been entered into the deficiency database.

Sanitary Survey, Finished (SNSV) 04/18/2007 3 YR  * 04/24/2007 (6) WASCO COUNTY No details
Sanitary Survey, Finished (SNSV) 01/15/2003 3 YR  * WASCO COUNTY Show details