OHA Drinking Water Services
OR41
PWS ID: 05246 ---- PGE BEAVER GENERATING STATION

Most Recent Water System Survey
Survey date: Sep 21, 2022
Notification date: Nov 03, 2022 (43 days)
Regulating agency: DWS (REGION 1)
Survey frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Significant deficiencies and unmet rule requirements:
Category Significant deficiency or unmet rule requirement Due date Resolved date
Finished Water Storage No screened ventDec 22, 2022 Dec 20, 2022
Operator Certification No protocol for under-certified operatorDec 22, 2022 Dec 20, 2022
Disinfection UV Disinfection: No intensity sensor with alarm or shut-offDec 22, 2022 Dec 20, 2022
Surface Water Treatment Turbidimeters not calibrated per manufacturer or at least quarterlyDec 22, 2022 Dec 20, 2022
Bold text indicates a significant deficiency. All others are unmet rule requirements.


 Hide Site Visit History
Water System Site Visit History
Reason Visit date Frequency Next due Notification date
(Days after survey)
Responsible
agency
Comments and
significant deficiencies or unmet rule requirements
Sanitary Survey, Finished (SNSV) 09/21/2022 3 YR  * 11/03/2022 (43) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 09/21/2022 6 MN 03/21/2023 11/03/2022 (43) REGION 1 No details
Sanitary Survey, Finished (SNSV) 03/02/2017 5 YR  * 03/21/2017 (19) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 03/02/2017 5 YR 03/02/2022 03/21/2017 (19) REGION 1 No details
Sanitary Survey, Finished (SNSV) 05/02/2012 5 YR  * 05/18/2012 (16) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 05/02/2012 1 YR 05/02/2013 05/18/2012 (16) REGION 1 Hide details
  Comments:
The deficiencies noted are as follows:

Treatment Deficiencies
1. Filters not covered. - Corrected 5/22/13
Finished Water Storage Deficiencies

2. Hatch not locked or adequately secured.- Corrected 7/3/12

Distribution Deficiencies
3. Cross connection devices not tested annually. - Corrected 11/1/12
4. No approved cross connection device on potential cross connection hazard.- Corrected 7/25/12

Monitoring Deficiencies
5. No coliform sampling plan.- Corrected 9/1/12

Operator Certification Deficiencies
6. No DRC certified at the appropriate level. - Corrected 5/1/13


Water Treatment Plant Site Visit (TRTP) 08/12/2011 6 MN 02/12/2012 08/23/2011 (11) COLUMBIA COUNTY Show details
Sanitary Survey, Finished (SNSV) 02/14/2007 5 YR  * 03/16/2007 (30) COLUMBIA COUNTY No details