OHA Drinking Water Services
OR41
PWS ID: 00702 ---- RHODODENDRON WTR ASSOC

Most Recent Water System Survey
Survey date: May 04, 2023
Notification date: May 17, 2023 (13 days)
Regulating agency: DWS (REGION 1)
Survey frequency: 5 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Significant deficiencies and unmet rule requirements: Outstanding Performer!
No significant deficiencies or unmet rule requirements were identified for this survey.


 Hide Site Visit History
Water System Site Visit History
Reason Visit date Frequency Next due Notification date
(Days after survey)
Responsible
agency
Comments and
significant deficiencies or unmet rule requirements
Sanitary Survey, Finished (SNSV) 05/04/2023 5 YR  * 05/17/2023 (13) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 05/04/2023 5 YR 05/04/2028 05/17/2023 (13) REGION 1 No details
Sanitary Survey, Finished (SNSV) 11/01/2018 5 YR  * 11/30/2018 (29) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 11/01/2018 5 YR 11/01/2023 11/30/2018 (29) REGION 1 No details
Sanitary Survey, Finished (SNSV) 09/03/2015 3 YR  * 03/04/2016 (183) REGION 1 No details
Water Treatment Plant Site Visit (TRTP) 09/03/2015 3 YR 09/03/2018 03/04/2016 (183) REGION 1 No details
Sanitary Survey, Finished (SNSV) 08/02/2012 3 YR  * 08/27/2012 (25) DWP Show details
Sanitary Survey, Finished (SNSV) 05/27/2009 3 YR  * 06/18/2009 (22) DWP Show details
Sanitary Survey, Finished (SNSV) 05/16/2006 3 YR  * 09/05/2006 (112) DWP Hide details
  Comments:

The deficiencies noted are as follows:

Treatment Deficiencies
1. Develop Standard Operating Procedures for all operators.
2. Identify whether you need to install the hold-down devices required by the challenge test. The required devices are 5V-2787, while the installed hold-down devices are 2150 SE SP BHD.
3. Develop an alarm system or man the plant during all hours of operation.

Monitoring Deficiencies
4. Develop Coliform Sampling Plan (see template enclosed & online).
5. Combined Radium and Combined Uranium monitoring overdue.

Management & Operations Deficiencies
6. Develop and update an Operations and Maintenance Manual and make it accessible.
7. The 2005 Consumer Confidence Report was due 1 July 2006.

This site visit has not been entered into the deficiency database.

Sanitary Survey, Finished (SNSV) 03/02/2001 3 YR  * DWP Show details