OHA Drinking Water Services
OR41
PWS ID: 00041 ---- AMITY, CITY OF

Most Recent Water System Survey
Survey Date: Jul 12, 2023
Notification Date: Aug 11, 2023 (30 days)
Regulating Agency: DWS (REGION 1)
Survey Frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
Category Deficiency Due Date Resolved Date
Other Backflow assemblies/devices not tested annually OAR 333-061-0070(6)Sep 29, 2023 Overdue
Cross Connection Annual summary report not issued (CWS)Sep 29, 2023 Jul 13, 2023
Finished Water Storage Roof and access hatch not watertightSep 29, 2023 Dec 28, 2023 - Late
Finished Water Storage No flap valve, screen, or equivalent on overflowSep 29, 2023 Dec 28, 2023 - Late
Management & Operations Annual CCR not submitted (CWS)Sep 29, 2023 Sep 13, 2023
Operator Certification No protocol for under-certified operatorSep 29, 2023 Jul 12, 2023


 Hide Site Visit History
Water System Site Visit History
Reason Visit Date Frequency Next Due Notification Date
(Days after survey)
Responsible
Agency
Comments and
Deficiencies
Sanitary Survey, Finished (SNSV) 07/12/2023 3 YR  * 08/11/2023 (30) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 07/12/2023 3 YR 07/12/2026 08/11/2023 (30) REGION 1 No details
Sanitary Survey, Finished (SNSV) 11/10/2020 3 YR  * 01/05/2021 (56) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 11/10/2020 3 YR 11/10/2023 01/05/2021 (56) REGION 1 No details
Sanitary Survey, Finished (SNSV) 07/11/2017 3 YR  * 12/15/2017 (157) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 07/11/2017 6 MN 01/11/2018 12/15/2017 (157) REGION 1 No details
Sanitary Survey, Finished (SNSV) 05/01/2014 3 YR  * 05/07/2014 (6) DWP Show details
Water Treatment Plant Site Visit (TRTP) 05/01/2014 1 YR 05/01/2015 05/07/2014 (6) DWP Show details
Sanitary Survey, Finished (SNSV) 07/07/2011 3 YR  * 08/10/2011 (34) DWP Show details
Water Treatment Plant Site Visit (TRTP) 07/07/2011 3 YR 07/07/2014 08/10/2011 (34) DWP No details
Sanitary Survey, Finished (SNSV) 02/28/2008 3 YR  * 07/30/2008 (153) DWP Hide details
  Comments:
Deficiencies 1) Turbidimeters Not Calibrated Quarterly. On-line and benchtop turbidimeters must be calibrated according to factory specifications at least quarterly. On-line turbidimeters must have the appropriate amount of water flowing through them in order to accurately measure turbidity. At the time of the survey, it appeared that the combined filter effluent turbidimeter did not have an adequate flow rate. Please ensure that the flow rate is within manufacturer specifications. 2) Turbidity profiles not conducted at least quarterly (OAR 333-061-0076(3)(a)(D)) As discussed, turbidity should be measured from filtered water before, during and after a backwash. I have enclosed some information on conducting a backwash which you may find helpful. Temporary spikes in finished water turbidity are a common occurrence following a backwash. The turbidity profile can be used to determine appropriate backwash and filter-to-waste times, such that these initial spikes are minimized. An optimized backwash process should keep spikes experienced after the filters are brought on-line to levels below 0.3 NTU. Turbidity should drop to below 0.1 NTU within the first 15 minutes. 4) Lead and copper sampling is past due. Lead and Copper tap sampling must be completed every three years. The last round of sampling was completed in 1998. Ten lead and copper tap samples must be taken by September 30, 2008 and the results reported to our office by October 10, 2008.
This site visit has not been entered into the deficiency database.

Water Treatment Plant Site Visit (TRTP) 02/28/2008 3 YR 02/28/2011 07/30/2008 (153) DWP Show details
Water Treatment Plant Site Visit (TRTP) 04/21/2005 3 YR 04/21/2008 04/21/2005 (0) REGION 3 No details
Sanitary Survey, Finished (SNSV) 02/14/2004 3 YR  * DWP Show details
 




More information for this water system: SDWIS ID 4688
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA
Corrosion Control has moved to the Lead & Copper page.

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List

Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login