PWS ID: 00326 ---- GLIDE WATER ASSOCIATION

Most Recent Water System Survey
Survey Date: Oct 25, 2017
Notification Date: Dec 14, 2017 (50 days)
Regulating Agency: DWS (REGION 2)
Survey Frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
No deficiencies were identified.


 Hide Site Visit History
Water System Site Visit History
Reason Visit Date Frequency Next Due Notification Date
(Days after survey)
Responsible
Agency
Comments and
Deficiencies
Sanitary Survey, Finished (SNSV) 10/25/2017 3 YR  * 12/14/2017 (50) REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 10/25/2017 3 YR 10/25/2020 12/14/2017 (50) REGION 2 No details
Sanitary Survey, Finished (SNSV) 07/08/2014 3 YR  * 08/25/2014 (48) REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 07/08/2014 3 YR 07/08/2017 08/25/2014 (48) REGION 2 Hide details
  Comments:
11 points for WTP inspection Raw water turbidity not measured daily Turbidity calibration standards expired Standard WTP operating procedures not written and followed Disinfectant residuals not measured and recorded as required

Sanitary Survey, Finished (SNSV) 03/02/2011 3 YR  * REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 03/02/2011 3 YR 03/02/2014 REGION 2 No details
Sanitary Survey, Finished (SNSV) 05/28/2008 3 YR  * REGION 2 No details
Water Treatment Plant Site Visit (TRTP) 05/28/2008 3 YR 05/28/2011 DWP No details
Sanitary Survey, Finished (SNSV) 03/22/2006 3 YR  * 03/23/2006 (1) REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 03/22/2006 3 YR 03/22/2009 03/22/2006 (0) REGION 2 No details
Water Treatment Plant Site Visit (TRTP) 11/19/2005 3 YR 11/19/2008 11/19/2005 (0) REGION 2 No details
Sanitary Survey, Finished (SNSV) 03/07/2003 3 YR  * DWP Show details
 




For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA