PWS ID: 00551 ---- MYRTLE POINT, CITY OF

Most Recent Water System Survey
Survey Date: Dec 13, 2017
Notification Date: Feb 01, 2018 (50 days)
Regulating Agency: DWS (REGION 2)
Survey Frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
Category Deficiency Due Date Resolved Date
Finished Water Storage No flap valve, screen, or equivalent on overflowMar 22, 2018 Mar 05, 2015
Monitoring & Reporting No coliform sampling planMar 22, 2018 Jan 26, 2018
Operator Certification No protocol for under-certified operatorMar 22, 2018 Jan 23, 2018
Disinfection pH, temperature, and chlorine residual not measured daily at first userMar 22, 2018 Jan 01, 2018


 Hide Site Visit History
Water System Site Visit History
Reason Visit Date Frequency Next Due Notification Date
(Days after survey)
Responsible
Agency
Comments and
Deficiencies
Sanitary Survey, Finished (SNSV) 12/13/2017 3 YR  * 02/01/2018 (50) REGION 2 Show details
Sanitary Survey, Finished (SNSV) 04/30/2014 3 YR  * 05/28/2014 (28) REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 04/30/2014 6 MN 10/30/2014 05/28/2014 (28) REGION 2 Hide details
  Comments:
Water Treatment Plant Site Visit (WTPSV) Report

Settle water turbidity is NOT greater than or equal 1.0 NTU when average raw water turbidity is greater than or equal to 10 NTU. Pts 2
Operator does NOT know all chemical dosages applied in mg/L. Pts 3
Optimization goals are not immediately after back wash - Time to return below 0.1 NTU appears much longer than 15 minutes Pts. 4
CT's are NOT correctly calculated - Contact time is NOT based on tracer study or adequate alternative. Pts 10
Jesse Vicent has signed the protocol, but Bob Love has NOT. Pts 5

Total Points 24 which makes it necessary for the next WTPSV to be within six (6) months of this survey (10-30-2014)


Sanitary Survey, Finished (SNSV) 07/06/2011 3 YR  * 08/09/2011 (34) REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 07/06/2011 1 YR 07/06/2012 08/09/2011 (34) REGION 2 No details
Water Treatment Plant Site Visit (TRTP) 08/13/2009 3 YR 08/13/2012 10/08/2009 (56) REGION 2 Show details
Sanitary Survey, Finished (SNSV) 09/03/2008 3 YR  * 09/18/2008 (15) REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 09/03/2008 6 MN 03/03/2009 09/18/2008 (15) REGION 2 Show details
Sanitary Survey, Finished (SNSV) 09/28/2005 3 YR  * REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 09/28/2005 3 YR 09/28/2008 02/06/2006 (131) REGION 2 No details
Water Treatment Plant Site Visit (TRTP) 02/03/2005 1 YR 02/03/2006 02/03/2005 (0) REGION 2 No details
 




For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA