PWS ID: 00689 ---- CITY OF RAINIER

Most Recent Water System Survey
Survey Date: Dec 06, 2021
Notification Date: May 04, 2022 (149 days)
Regulating Agency: DWS (REGION 1)
Survey Frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
Category Deficiency Due Date Resolved Date
Surface Water Treatment For conventional or direct filtration: Turbidity profile not conducted on individual filters at least quarterlyJun 22, 2022 Jun 22, 2022
Operator Certification No protocol for under-certified operatorOct 31, 2022 * Jul 14, 2022
Management & Operations No operations and maintenance manualMar 31, 2023 * Mar 23, 2023
Management & Operations Emergency response plan not completedMar 31, 2023 * Mar 23, 2023
Management & Operations Master plan not current (≥ 300 con.)Jun 30, 2023 * Jun 30, 2023
* Corrective Action Plan has been submitted for this deficiency.


 Hide Site Visit History
Water System Site Visit History
Reason Visit Date Frequency Next Due Notification Date
(Days after survey)
Responsible
Agency
Comments and
Deficiencies
Sanitary Survey, Finished (SNSV) 12/06/2021 3 YR  * 05/04/2022 (149) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 12/06/2021 1 YR 12/06/2022 05/04/2022 (149) REGION 1 No details
Sanitary Survey, Finished (SNSV) 11/16/2018 3 YR  * 12/14/2018 (28) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 11/16/2018 1 YR 11/16/2019 12/14/2018 (28) REGION 1 No details
Sanitary Survey, Finished (SNSV) 04/08/2015 3 YR  * 04/29/2015 (21) DWP Show details
Water Treatment Plant Site Visit (TRTP) 04/08/2015 1 YR 04/08/2016 04/29/2015 (21) DWP Show details
Water Treatment Plant Site Visit (TRTP) 07/23/2014 3 YR 07/23/2017 08/07/2014 (15) REGION 1 No details
Sanitary Survey, Finished (SNSV) 06/18/2012 3 YR  * 07/10/2012 (22) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 06/18/2012 6 MN 12/18/2012 07/10/2012 (22) REGION 1 Show details
Sanitary Survey, Finished (SNSV) 11/05/2009 3 YR  * 12/08/2009 (33) DWP Hide details
  Comments:
Deficiencies 1. No Cross Connection Control Specialist (OAR 333-061-0070). Community water systems with 300 or more service connections are required to have a Certified Cross Connection Control Specialist administer the water system’s cross connection control program. 2. Annual Summary Report for the cross connection control program not submitted for calendar year 2008 (OAR 333-061-0070). In Community water systems having 300 or more connections, water suppliers are required to prepare and submit a cross connection control Annual Summary Report to the Department of Human Services - Drinking Water Program, on forms provided by the Department, before the last working day of March each year. 3. New 15,000 gallon steel tank was installed without plan approval (OAR 333-061-0060). Construction and installation plans for new systems or major additions or modifications (treatment, pump stations, tanks, etc.) must be submitted to and approved by the Department of Human Services – Drinking Water Program before construction begins. Plan review submission information can be found on our website at: http://oregon.gov/DHS/ph/dwp/planreview.shtml . Please submit plans for the tank for our review as soon as possible. In addition to the above listed deficiencies, I have the following recommendations: 1. Ensure that all reservoir drains/overflows are cleared of vegetation and soil in order to ensure proper operation of the flap valves. 2. Begin recording chemical dosages (mg/l) daily. 3. Clear debris gathered at the top of the Fox Creek dam. 4. Keep pealing paint and corrosion of reservoirs in check (see photographs below) 5. Complete periodic water loss studies to identify un-accounted for water (leaks, faulty meters, etc.). 6. Keep corrosion and leaks in check in the pump stations (see photographs below). 7. Implement an annual flushing program to keep sediments from building up in the distribution system.
This site visit has not been entered into the deficiency database.

Water Treatment Plant Site Visit (TRTP) 11/05/2009 3 YR 11/05/2012 12/08/2009 (33) DWP Show details
Sanitary Survey, Finished (SNSV) 04/26/2006 3 YR  * 05/15/2006 (19) REGION 1 Show details
Water Treatment Plant Site Visit (TRTP) 04/26/2006 3 YR 04/26/2009 05/15/2006 (19) REGION 1 Show details
Sanitary Survey, Finished (SNSV) 07/30/2002 3 YR  * DWP Show details
 




More information for this water system: SDWIS ID 3985
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA
Corrosion Control has moved to the Lead & Copper page.

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List

Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login