PWS ID: 00939 ---- WESTFIR, CITY OF

Most Recent Water System Survey
Survey Date: Sep 18, 2019
Notification Date: Jan 30, 2020 (134 days)
Regulating Agency: DWS
Survey Frequency: 3 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
Category Deficiency Due Date Resolved Date
Cross Connection Testing records not current (CWS, NTNC, TNC)Dec 31, 2019 Feb 18, 2020 - Late


 Hide Site Visit History
Water System Site Visit History
Reason Visit Date Frequency Next Due Notification Date
(Days after survey)
Responsible
Agency
Comments and
Deficiencies
Sanitary Survey, Finished (SNSV) 09/18/2019 3 YR  * 01/30/2020 (134) DWP Show details
Water Treatment Plant Site Visit (TRTP) 09/18/2019 3 YR 09/18/2022 01/30/2020 (134) DWP No details
Sanitary Survey, Finished (SNSV) 09/23/2016 3 YR  * 09/27/2016 (4) REGION 2 Show details
Water Treatment Plant Site Visit (TRTP) 09/23/2016 3 YR 09/23/2019 09/27/2016 (4) REGION 2 No details
Sanitary Survey, Finished (SNSV) 08/29/2013 3 YR  * 10/17/2013 (49) REGION 2 Show details
Sanitary Survey, Finished (SNSV) 12/29/2010 3 YR  * 12/01/2010 (-28) DWP Hide details
 
Category Deficiency Due Date Resolved Date
Cross Connection No ordinance or enabling authority (CWS)Not tracked
Cross Connection Testing records not current (CWS, NTNC, TNC)Not tracked
Other OtherNot tracked
Disinfection pH, temperature, and chlorine residual not measured daily at first userNot tracked
Disinfection No means to adequately determine disinfection contact time under peak flow and minimum storage conditionsNot tracked
Deficiency dates were not tracked prior to 1/1/2014.
Sanitary Survey, Finished (SNSV) 08/08/2007 3 YR  * 09/12/2007 (35) REGION 2 No details
Water Treatment Plant Site Visit (TRTP) 08/08/2007 3 YR 08/08/2010 09/12/2007 (35) REGION 2 No details
Sanitary Survey, Finished (SNSV) 01/14/2004 3 YR  * DWP Show details
 




For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA