OHA Drinking Water Services
OR41
PWS ID: 01090 ---- USFS SILVER LAKE RS

Most Recent Water System Survey
Survey Date: Sep 23, 2020
Notification Date: Mar 08, 2021 (166 days)
Regulating Agency: DWS (REGION 2)
Survey Frequency: 5 YR  -  Visit the Water System Surveys page to see the list of surveys due each year.
Deficiencies:
Category Deficiency Due Date Resolved Date
Finished Water Storage Hatch not locked or adequately securedDec 01, 2021 * Nov 17, 2021
Finished Water Storage Roof and access hatch not watertightDec 01, 2021 * Nov 17, 2021
Finished Water Storage No screened ventDec 01, 2021 * Nov 17, 2021
Management & Operations Emergency response plan not completedDec 01, 2021 * Nov 17, 2021
Monitoring & Reporting Monitoring not currentDec 01, 2021 * Nov 17, 2021
* Corrective Action Plan has been submitted for this deficiency.


 Hide Site Visit History
Water System Site Visit History
Reason Visit Date Frequency Next Due Notification Date
(Days after survey)
Responsible
Agency
Comments and
Deficiencies
Sanitary Survey, Finished (SNSV) 09/23/2020 5 YR  * 03/08/2021 (166) REGION 2 Show details
Sanitary Survey, Finished (SNSV) 11/01/2012 5 YR  * 02/26/2013 (117) DWP Hide details
  Comments:
Significant Deficiencies: Source: Sanitary seal not watertight. If needed, cap the faulty water level measuring device to ensure a sanitary seal. Fix leak in adjacent pipe. Distribution: Cross connection hazards not addressed, no records of annual testing of existing devices. Management & Operations: No O&M manual; No Emergency Response Plan Recommendatuions - Monitoring & reporting: Update Coliform Sampling Plan with GWR requirements & terminology Distribution: Develop a schedule for flushing and valve turning; determine whether additional valves are needed to respond to maintenance or emergency situations.
Category Deficiency Due Date Resolved Date
Cross Connection Testing records not current (CWS, NTNC, TNC)Not tracked
Management & Operations No operations and maintenance manualNot tracked
Management & Operations Emergency response plan not completedNot tracked
Well Construction Sanitary seal and casing not watertightNot tracked
Deficiency dates were not tracked prior to 1/1/2014.
Sanitary Survey, Finished (SNSV) 08/27/2009 3 YR  * 10/15/2009 (49) DWP Show details
Sanitary Survey, Finished (SNSV) 11/13/2003 5 YR  * 11/13/2003 (0) DWP Show details
 




More information for this water system: SDWIS ID 3814
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA
Corrosion Control has moved to the Lead & Copper page.

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List

Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login