OHA Drinking Water Services
OHA Drinking Water Services
Contact Report Details

PWS ID: OR41 00214
PWS Name: GARDEN VALLEY WATER ASSOCIATION
 
Who Was Contacted: STEVE PENNINGTON
Contact Phone: 541-808-7230 (Email address hidden)
Contact Date: 02/08/2022
Contacted By: DOWNS, KENT (DWP)
Contact Method/Location: Phone
 
Assistance Type: VIOLATION RESPONSE
Reasons: SWTR
 
Details: 02.07.2022- Update: Steve informed me that turbidity levels are back within normal range and the precautionary boil water notice was lifted. The dam restoration works are going well.

Steve also reported that Raymond. S Doan will no longer be their DRC. Jason Carman with RCAC is helping Steve find a new DRC. On 02.07.22, I Emailed Steve a link to access the list of certified operators in Oregon. The system is required to submit the Water System Designated Operator Form within 30 days after any change.

12.29.2021-Steve reported another high turbidity event on December 13, through December 24. The highest turbidity reading recorded at the combine filter effluent (CFE) was: 0.7 NTU on Dec 22, 0.6 NTU on Dec 23 and 0.5 NTU on Dec 13-16. The free chlorine residual at the entry point during the high NTU event was 1.1 ppm and CT value was met.

The dam at the creek is filling up with silt and in need of cleaning. During heavy rains the silt accumulated in the dam affects the raw water turbidity. Normal raw water turbidity is below 5 units, but during heavy rains it can exceed 10 turbidity units. When it is this high, the treatment plant can’t ensure treated water below 0.3 turbidity units.

Given the circumstances, a boil water notice is not required at this time. However, by the end of December, more than 5 percent of the 4-hours turbidity readings are expected to exceed the standard of 0.3 NTUs for the month. The system was advised to post a Tier 2 notice.

To address the issues, the system cleaned the settling tank on 12/29/2021. The cleaning and flushing of the dam is scheduled for 01/02/2022. During this time the water intake hose will also be cleaned and repositioned to a lower silt/sediment load zone. Once the water level is lower, the dam will be dredged. The system will inform customers when the project is completed.
 
Associated Violations: Viol #902130047, 12/01/2021 - 12/31/2021: SWTR - Turbidity Standards Not Met (95% NTU)  See also: 02/22/2022



More information for this water system: SDWIS ID 3883
System Info  ::  Report for Lenders  ::  Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Contacts & Advisories  ::  Site Visits  ::  Public Notice
Coliform Summary  ::  Coliform Results  ::  Coliform Schedules  ::  LT2  ::  GW/GWUDI Source Details  ::  Plan Review  ::  Annual Fee
Chemical Summary  ::  Chemical Results  ::  Chemical Schedules  ::  Chemical Schedule Summary  ::  Arsenic RAA  ::  Cyanotoxins  ::  PFAS
Lead & Copper  ::  DBP Sample Sites  ::  FANLs  ::  MRDL  ::  GWR 4-Log  ::  Turbidity  ::  SWTR  ::  LRAA
Corrosion Control has moved to the Lead & Copper page.

Information for all water systems:
Water System Inventory  ::  Water System Surveys  ::  Outstanding Performers  ::  Treatment Plant Inspections  ::  Treatment  ::  Plan Reviews
Alerts  ::  Violations  ::  Compliance & Enforcement  ::  Deficiencies  ::  System Scores  ::  Exceedances  ::  Public Notices  ::  Service Lines
Water Advisories  ::  Contact Reports  ::  Cyanotoxins  ::  PFAS  ::  Post-wildfire VOCs  ::  Fluoride  ::  Certification List

Introduction  ::  Data Search Options  ::  Water System Search  ::  DWS Home  ::  DWS Rules

Need help? Email Drinking Water Services for assistance.Staff/Partner Login