OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 01062 | ||
PWS Name: | RAINBOW ROCK VILLAGE MHP | ||
Who Was Contacted: | Brenda Vasquez | ||
Contact Phone: | (Email address hidden) | ||
Contact Date: | 11/19/2024 | ||
Contacted By: | DOWNS, KENT (DWP) | ||
Contact Method/Location: | |||
Assistance Type: | SURVEY/DEFICIENCY FOLLOW-UP | ||
Survey: | 05/24/2024 | ||
Reasons: | Operations |
||
Details: | 2024 WS Survey 11.19.2024-Operator submitted Turbidity profiles for 3rd and 4rth quarter of 2024. 10.24.2024-The operator was informed that the existing sand filters are not LT2 compliant filters. The system needs to install a LT2 compliance filter. The existing filters can probably be used as pre-filters to a LT2 compliant cartridge filter. The circuit Rider will be available to help the system prepare the action plan and documentation for plan review. The due date for final plan review approval of the new filtration system is November 30, 2024. However, if the system can present an action plan and initiate plan review approval process by this date, a time extension will be granted. 08.23.2024-Operator provided photo documentation verifying the relocation of the CFE monitoring line. 08.19.2024-Operator reported that they are working on moving the turbidity line after the filters. Plumbing is also being worked on to be able to complete the turbidity profiles and allow filter to waste capabilities. 07.08.2024-Operator submitted an action plan to address survey deficiencies. - CFE monitoring location changed due 08.31.2024 - Completed on 08.23.2024 - Filter turbidity profiles due 08.31.2024 - SOPs for UV and filters completed on 07.07.2024 - DRC filtration endorsement certification due 12.31.2024 - Plan review needed for all major modifications due November 30, 2024 06.28.2024-Requested an update on the status of the corrective actions for survey deficiencies and rule violations. Operator confirmed that she has received the survey report and will be addressing the deficiencies soon. 06.24.2024-Survey report emailed to water system operator. System deficiencies identified. Corrective actions due by July 12, 2024. Operator was advised to contact plan review engineer to initiate plan review process for new filters, UV reactor and additional changes. |