OHA Drinking Water Services
Contact Report Details |
|||
| PWS ID: | OR41 94489 | ||
| PWS Name: | WHALESHEAD BEACH RESORT, LLC | ||
| Who Was Contacted: | Giovanni Rangel | ||
| Contact Phone: | (Email address hidden) | ||
| Contact Date: | 01/22/2026 | ||
| Contacted By: | DOWNS, KENT (DWP) | ||
| Contact Method/Location: | |||
| Assistance Type: | OTHER REGULATORY - WTP A Tracer Study | ||
| Reasons: | Operations |
||
| Details: | 01.22.2026 - The circuit rider and the operator agreed to the following plan: • Week of February 2 – Site visit to inspect WTP-A and collect information needed to develop a CT study methodology • Week of February 9 – Submit proposed CT study methodology to OHA for review and approval • Week of March 23 – Conduct CT field test • Week of April 13 – Complete CT study report and submit to OHA The operator is aware that this is a rough best-case milestone plan. The dates could move around some bases on the circuit rider's workload. 01.21.2026 - Now that the system has completed the WTP-B tracer study. The operator was instructed to coordinate with the Circuit Rider engineer to conduct a tracer study for WTP-A. |
||