OHA Drinking Water Services
Groundwater/GWUDI Source Detail for PWS 00164 ---- CANNON BEACH, CITY OF

Non-purchased Groundwater/GWUDI Sources:
Related Pages:
Contact Us:
  • Email us with questions, comments,
    or suggestions about this page.


SRC-AA:  MAIN SPRING #1
GW, Active, Permanent ---- Operating Period: Jan 1 - Dec 31
Disinfection:  GASEOUS CHLORINATION, POST
Sensitivity Analysis Data
Aquifer sensitivity: High   Surface water within 500 feet: Yes
Construction adequate?: Yes   Surface water type: Stream
E. coli sources within 2-year time-of-travel: Yes   Data last updated: 02/09/2022
Monthly Assessment Monitoring Data
Monthly Assessment Monitoring Required? Completed

Monthly Schedule (Closed): 1 sample(s) per month to be taken beginning 07/01/2022 - 06/30/2023
 JanFebMarAprMayJunJulAugSepOctNovDecTotal
# Samples
TC+
E. coli+
0
-
-
1
0
0
1
1
0
1
1
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
11
2
0
Outcome/Determination:  Low Risk
No historic GWUDI data were found.
Back to top
SRC-AC:  HASKEL SPRING
GW, Active, Permanent ---- Operating Period: Jan 1 - Dec 31
Disinfection:  GASEOUS CHLORINATION, POST
Sensitivity Analysis Data
Aquifer sensitivity: High   Surface water within 500 feet: Yes
Construction adequate?: Yes   Surface water type: Stream
E. coli sources within 2-year time-of-travel: Yes   Data last updated: 02/09/2022
Monthly Assessment Monitoring Data
Monthly Assessment Monitoring Required? Completed

Monthly Schedule (Closed): 1 sample(s) per month to be taken beginning 07/01/2022 - 06/30/2023
 JanFebMarAprMayJunJulAugSepOctNovDecTotal
# Samples
TC+
E. coli+
0
-
-
1
0
0
1
0
0
1
1
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
11
1
0
Outcome/Determination:  Low Risk
No historic GWUDI data were found.
Back to top
SRC-AD:  HOWELL SPRING
GW, Active, Permanent ---- Operating Period: Jan 1 - Dec 31
Disinfection:  GASEOUS CHLORINATION, POST
Sensitivity Analysis Data
Aquifer sensitivity: High   Surface water within 500 feet: No
Construction adequate?: Yes   Surface water type: Unknown
E. coli sources within 2-year time-of-travel: Yes   Data last updated: 02/09/2022
Monthly Assessment Monitoring Data
Monthly Assessment Monitoring Required? Completed

Monthly Schedule (Closed): 1 sample(s) per month to be taken beginning 07/01/2022 - 06/30/2023
 JanFebMarAprMayJunJulAugSepOctNovDecTotal
# Samples
TC+
E. coli+
0
-
-
1
0
0
1
0
0
1
1
0
1
0
0
1
1
0
1
0
0
1
0
0
1
1
0
1
1
0
1
0
0
1
0
0
11
4
0
Outcome/Determination:  Chronic Total Coliform
No historic GWUDI data were found.
Back to top
SRC-AB:  MAIN SPRING #2 (DISCONNECTED)
GW, Inactive (Disconnected), Other ---- Operating Period: Jan 1 - Dec 31
Disinfection:  GASEOUS CHLORINATION, POST
Sensitivity Analysis Data
Aquifer sensitivity: High   Surface water within 500 feet: Unknown
Construction adequate?: Unknown   Surface water type: Unknown
E. coli sources within 2-year time-of-travel: Unknown   Data last updated: 05/14/2010
Monthly Assessment Monitoring Data
Monthly Assessment Monitoring Required? Unknown
No monthly assessment monitoring schedule found.
No historic GWUDI data were found.
Back to top
2 sec


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAAFor SDWIS: 3880