66-2019 Test Well Reconstruction 06/11/2019 06/07/2019 07/03/2019 09/03/2020 JN
243-2006 Iron Removal 09/22/2006 02/13/2007 PF
21-1997 Water Storage/Reservoir & Transmission Line 01/29/1997 02/18/1997 04/05/1999 MW
329-1996 Master Plan 10/03/1996 01/03/1997 MW
255-1998 Cedar Glenn II 03/26/1999 CG
156-1997 McKenzie Valley Subdivision 09/04/1997 10/13/99 BW
 



For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA