Chemical Sampling Schedule Status         OR4101062 -- RAINBOW ROCK VILLAGE MHP
Sample
Point
ID
Analyte
Code
Analyte
  Sampling
Interval
Monitoring
Period
Start
Monitoring
Period
Due Date
Days
Until
Due
Samples
Required
Samples
Received
Last
Sample
Date
DIST-A  DISTRIBUTION SYSTEM 2456 TOTAL HALOACETIC ACIDS (HAA5)  Quarterly04/01/2023 - 06/30/2023 24 1 0 03/29/2023
2DBP-02 :  SPACE #8
DIST-A  DISTRIBUTION SYSTEM 2950 TTHM  Quarterly04/01/2023 - 06/30/2023 24 1 0 03/29/2023
2DBP-02 :  SPACE #8


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA