System Information     Schedule Counts
Status:  ACTIVE
System Type:  Community
Population Served:  300
 Active:  2     Show Only Active
Inactive:  0
Expired:  5

PWS #:  00059   FERNHILL COMMUNITY WTR SYSTEM    Routine Sampling Schedules For Chemicals
Facility
ID
Name Status Test Group Samples
Required
   Sampling
Interval
Start End    Notes
DIST-A DISTRIBUTION SYSTEMALEAD & COPPER5  3 Years01/01/2017OpenSample Between June 1st and Sept 30th
DIST-A DISTRIBUTION SYSTEMASTAGE 2 DBP1  Yearly01/01/2016OpenCollect one dual sample set at 92100 Claremont Rd. in September
Expired Schedules
DIST-ADISTRIBUTION SYSTEMAHAA5 & TTHM1  Yearly01/01/200412/31/2013Sample between June 1 and Sept. 30.
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER5  3 Years01/01/200506/30/2015Sample Between June 1st and Sept 30th
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER10  6 Months07/01/201506/30/2016Increased monitoring due to exceeding the action level for lead.
DIST-ADISTRIBUTION SYSTEMALEAD & COPPER5  Yearly01/01/200212/31/2004Sample Between June 1st and Sept 30th
DIST-ADISTRIBUTION SYSTEMASTAGE 2 DBP1  Yearly01/01/201412/31/2015Sample in September.


For further information on this public water system, click on the area of interest below:
System Info :: Report for Lenders :: Alerts :: Violations :: Compliance & Enforcement :: Contacts & Advisories :: Site Visits :: Public Notice
Coliform Summary :: Coliform Results :: Sampling Schedule for Coliform :: Groundwater/GWUDI Source Details :: Plan Review :: Annual Fee
Chemical Group Summary :: Latest Chemical Results :: Entry Point Detects :: Single Analyte Results 
Chemical Schedule Summary :: Chemical Schedule Details
Lead & Copper :: Corrosion Control (LCR) :: Nitrate :: Arsenic :: Radionuclides :: GWR 4-Log :: LT2 :: Cyanotoxins :: PFAS
DBPs :: TOC & Alkalinity :: DBP Sample Sites :: FANLs :: MRDL :: Turbidity :: SWTR :: RAA :: LRAA