| System Information | Schedule Counts |
Status: Active System Type: Community Population Served: 45 | Active: 2 Show Only Active Inactive: 0 Expired: 1 |
| Routine Sampling Schedules For Chemicals | ||||||||
| Facility ID |
Name | Status | Test Group | Samples Required |
Sampling Interval |
Start | End | Notes |
| DIST-A | Distribution System | A | LEAD & COPPER | 5 | Yearly | 01/01/2026 | Open | Collect samples between June 1 and September 30 every year, from cold water, drinking water taps. |
| DIST-A | Distribution System | A | STAGE 2 DBP | 2 | Yearly | 01/01/2022 | Open | Collect two dual sample sets during the month of warmest water temperatures, one sample at the master meter and one at the location expected to have highest TTHM concentrations. |
| Expired Schedules | ||||||||
| DIST-A | Distribution System | A | LEAD & COPPER | 5 | 6 Months | 01/01/2022 | 06/30/2025 | |